Many neighbors have contacted our office with questions and concerns about this construction project. We worked with the owner to share the plan documents here and set up a question and answer call for neighbors on Tuesday, July 14th at 5:30pm. Please read more below.
Project Facts:
The Project is designed “As of Right” and requires no Zoning Changes
The Project includes (18) Dwelling Units, as opposed to (30) Units allowed under current Zoning
The Project will be 4-Stories, as opposed to 5-Stories allowed under current Zoning
The Project will be 47′ in Height, as opposed to 65′ allowed under current zoning
The Project includes (20) Off-Street Parking Spaces, and (10) Bike Parking Spaces
Existing Curb Cut at Henderson to be removed, adding (1) On-Street Parking Space
Dwelling Units are all 2-Bedroom/2-Bath with Den, to attract Long Term Renters
1st Floor includes 2,500 SF Retail Space, Loading Zone and Trash Enclosure as required by Zoning
Project Timeline and Construction Details:
Zoom meeting for neighbors organized through Ald. Rossana Rodriguez’s office at 5:30pm on 7/14/20 – email info@33rdward.org to RSVP and receive a zoom meeting link
Demolition will commence on or about 7/15/20, a permit has already been awarded by the Chicago Department of Buildings
Construction will commence on or about 8/1/20
Building is scheduled to be fully-enclosed on or about 12/31/20
Substantial Completion will be on or about 5/30/21
Foundation wall along South property line will remain in place for future fencing
Foundation wall along East property line will remain in place for future Landscape Planter
100′ of California Avenue is being fully Re-Paved
50′ of Public Alley is being Restored
225′ of City Sidewalks at California/Henderson are being removed and replaced
ADA Ramps at SW Corner of California/Henderson are being removed and replaced
GC has arranged for all Construction Vehicles to be parked at WMS Lot during Construction
GC has stipulated daily work hours from 8AM to 6 PM
GC to provide Site and Street Cleaning, as required by City Ordinance
GC to provide Dust and Particulate Control measures, as required by City Ordinance
GC to provide Site Fencing, Security Systems and Cameras, to insure Project Safety
GC is Macon Construction, 3401 N California, 773-665-9252